Modular Data Center Preparation

About

THIS PROJECT

This project required over three acres of site preparation for a modular data center. Preparation for the installation included:

  • Fiber ductbanks and fiber cabling
  • Electric infrastructure, including two 13.5kv switchgear and two 480v substations
  • Security system with motion activated cameras and vibration sensing fence cabling
  • Underground utilities
  • Equipment pads
  • Paving and landscaping
  • Large-diameter stormwater management piping and structures

Whiting-Turner worked closely with the data center provider to successfully coordinate delivery, installation and commissioning.